The plumbers showed up and finished all the plumbing in the new bathroom off the empty bedroom. We have a working shower, a toilet and running water in the sink. The door is coming after the 1st of February. Now all I have to do is finish painting and put up a shower curtain. Who needs a door?
In anticipation of the delivery of our washing machine we decided we better make a decision about flooring in the laundry room. We had that installed in both the hall and the laundry room today.
For the carpenters the laundry room was first on their list. They removed the mushroom table from the kitchen and placed it in the laundry room as a folding table for me. Last night we took the left over piece of wood from making the curved shelf out of the dumpster, the one that has taken up residency in our yard. I thought it would make a perfect shelf above the folding table. It looks so much better in the laundry room.
Then as Huey put trim in the laundry room and did the finishing touches on the shower, Bill started to build a counter shelf in the kitchen for me. The rest will be finished on Monday. I think the switch looks so much better.
From this . . .
to this . . .
to this.
And, yay for us we get to sleep in tomorrow.